Skip to main content

Original text


Powered by Google TranslateTranslate
Powered by Google TranslateTranslate
Manual Changes Required in Engage
>
December 18, 2023
Rating
Man working with his laptop on couch smiling
Download Guide

Towards the end of the 3 month provisional phase the coach needs make some manual changes in Engage to ensure the volunteer moves to "Active".

These are the steps.

SHARE THIS ARTICLE
CONNECT
230 COMMERCE WAY SUITE 102
}
PORTSMOUTH, NH, 03801
(603) 433-0575

Copyright © 2024 SCORE Association, SCORE.org

Funded, in part, through a Cooperative Agreement with the U.S. Small Business Administration. All opinions, and/or recommendations expressed herein are those of the author(s) and do not necessarily reflect the views of the SBA.

Chat generously provided by:LiveChat

In partnership with
Jump back to top